Design and Development of Three-Stage Industrial Car Washing System

Project Code :TEMBMA3241

Objective

The main objective of this project is to Develop Three stage Washing System like Spraying, Cleaning and Drying on a Single Setup

Abstract

Car wash systems allow for fully automated car wash in a short amount of time. Here we demonstrate a smart car wash system that allows for completely automated car washing process. The system consists of a 3-stage car wash system. The system consists of a small conveyor type belt that holds on to a car. The system has an IR sensor to check if a car has been parked in the system. On detection the system now starts the belt movement using a motorized system and vehicle moves to the first stage and starts washing the car for some time and the conveyor starts moving again and in 2nd stage brushes are used to clean the cars in 3rd stage fan will ON and make the car dry and starts the conveyor belt so that the car went out of the cleaning place.

Keywords: Car Washing, Automatic Process, 3 stage process.

NOTE: Without the concern of our team, please don't submit to the college. This Abstract varies based on student requirements.

Block Diagram

Specifications

Hardware Requirements:

  • Arduino
  • IR Sensors
  • Relays
  • DC Pump
  • DC Motors
  • DC Fan
  • Power Supply

Software Requirements:

  • Arduino IDE
  • Embedded C
  • Fritzing

Learning Outcomes

  • Arduino pin diagram and architecture
  • How to install Arduino IDE  software
  • Setting up and installation procedure for Arduino
  • Introduction to Arduino IDE
  • Basic coding in Arduino IDE
  • Working of DHT11 sensor
  • Interface DHT11 sensor with Arduino?
  • Working of Soil moisture sensor
  • Interface Soil moisture with Arduino?
  • Working of Relay
  • Interface Relay with Arduino?
  • Working of Pump motor
  • Interface Pump motor with Arduino?
  • Working of power supply
  • About Project Development Life Cycle:
    • Planning and Requirement Gathering( software’s, Tools, Hardware components, etc.,)
    • Schematic preparation 
    • Code development and debugging
    • Hardware development and debugging
    • Development of the Project and  Output testing
  • Practical exposure to:
    • Hardware and software tools.
    • Solution providing for real time problems.
    • Working with team/ individual.
    • Work on Creative ideas.
  • Project development Skills
    • Problem analyzing skills
    • Problem solving skills
    • Creativity and imaginary skills
    • Programming skills
    • Deployment
    • Testing skills
    • Debugging skills
    • Project presentation skills
    • Thesis writing skills

Demo Video

Final year projects