A PHP Error was encountered

Severity: Notice

Message: Trying to get property of non-object

Filename: models/General_model.php

Line Number: 92

Backtrace:

File: /home/takeoff99/public_html/application/models/General_model.php
Line: 92
Function: _error_handler

File: /home/takeoff99/public_html/application/controllers/Projects.php
Line: 193
Function: get_deptid_str

File: /home/takeoff99/public_html/index.php
Line: 315
Function: require_once

A PHP Error was encountered

Severity: Notice

Message: Trying to get property of non-object

Filename: models/Project_model.php

Line Number: 674

Backtrace:

File: /home/takeoff99/public_html/application/models/Project_model.php
Line: 674
Function: _error_handler

File: /home/takeoff99/public_html/application/controllers/Projects.php
Line: 201
Function: generate_breadcrumb

File: /home/takeoff99/public_html/index.php
Line: 315
Function: require_once

A PHP Error was encountered

Severity: Notice

Message: Trying to get property of non-object

Filename: models/Project_model.php

Line Number: 674

Backtrace:

File: /home/takeoff99/public_html/application/models/Project_model.php
Line: 674
Function: _error_handler

File: /home/takeoff99/public_html/application/controllers/Projects.php
Line: 201
Function: generate_breadcrumb

File: /home/takeoff99/public_html/index.php
Line: 315
Function: require_once

A PHP Error was encountered

Severity: Notice

Message: Trying to get property of non-object

Filename: models/Project_model.php

Line Number: 674

Backtrace:

File: /home/takeoff99/public_html/application/models/Project_model.php
Line: 674
Function: _error_handler

File: /home/takeoff99/public_html/application/controllers/Projects.php
Line: 201
Function: generate_breadcrumb

File: /home/takeoff99/public_html/index.php
Line: 315
Function: require_once

A PHP Error was encountered

Severity: Notice

Message: Trying to get property of non-object

Filename: models/Project_model.php

Line Number: 674

Backtrace:

File: /home/takeoff99/public_html/application/models/Project_model.php
Line: 674
Function: _error_handler

File: /home/takeoff99/public_html/application/controllers/Projects.php
Line: 201
Function: generate_breadcrumb

File: /home/takeoff99/public_html/index.php
Line: 315
Function: require_once

TAKEOFF - View Abstract
     Certificate Verification        Student Ambassador          Quick Pay        Request For Enquiry
Sell Your Project      Apply for franchise          
  • 0877-2261612       
  • +91-9030 333 433
  • +91-9966 062 884

Fault Current Hierarchical Limitation Strategy For Fault Ride-through Scheme Of Microgrid

FAULT CURRENT HIERARCHICAL LIMITATION STRATEGY FOR FAULT RIDE-THROUGH SCHEME OF MICROGRID

  • Project Code :
  • TEMAPS63
  • .

A PHP Error was encountered

Severity: Notice

Message: Trying to get property of non-object

Filename: projects/view_abstract.php

Line Number: 280

Backtrace:

File: /home/takeoff99/public_html/application/views/static/projects/view_abstract.php
Line: 280
Function: _error_handler

File: /home/takeoff99/public_html/application/controllers/Projects.php
Line: 202
Function: view

File: /home/takeoff99/public_html/index.php
Line: 315
Function: require_once

Buy Now

Cost will be available soon

Download Project Document / Synopsis

FAULT CURRENT HIERARCHICAL LIMITATION STRATEGY FOR FAULT RIDE-THROUGH SCHEME OF MICROGRID

As we are increasing the number of Micro-Grids, then the utility Grid experience difficulty of high level fault current at the time of Fault Ride Through of Micro-Grids. To overcome this problem, a fault current hierarchical limitation (FCHL) strategy is proposed, which consists of four levels: 1) fault current primary limitation control (FCPLC) is based on the proportional-resonant (PR) current controller; 2) fault current secondary limitation control (FCSLC) is formulated for current generation of grid-connected inverters (GCIs) with peak fault current limitation; 3) fault current tertiary limitation control (FCTLC) is formulated for the phase angle shifting of MG’s fault current to neutralize its effect on UG’s fault current; 4) fault  current quartus limitation control (FCQLC) is developed for the coordinated operation of parallel GCIs within grid code requirement. Simulation results verify the performance of proposed strategy with a successful fault ride through while the Micro-Grid’s output fault current has a small effect on the UG’s fault current amplitude.  

innovative
innovative Request Video

Package Features

  • 12/7 Support
  • Voice Conference
  • Video On Demand
  • Remote Connectivity
  • Customization
  • Live Chat Support
  • Toll Free Support

Includes

  • Complete Source Code
  • Complete Documentation
  • Complete Presentation Slides
  • Screenshots
  • Execution Procedure
  • Readme File
  • Addons
  • Video Tutorials

Leave Your Comment!

Your email address will not be published. Required fields are marked *